Project: Consultancy Services for the Preliminary Design, Detailed Engineering Design, Bidding Documentation, Assistance during Bidding and Bid Evaluation for the Design of the Water Distribution Network, Wastewater Treatment and Sewerage System for the Kabaale Industrial Park including a Feasibility Study on Supplying Water to KIP from River Nile or Kafu River. Funded by Government of Uganda.
Year: 2023-Date Client: Uganda National Oil Company |
Project: Consultancy Services for Infrastructure Development Pre-Feasibility and Master plan at Jinja Industrial and Business Park – Uganda. Funded by Cardno International Development
Year: 2022 Client: Uganda Cities and Infrastructure for Growth Program |
Project: Tilenga Community Water Feasibility Study.
Year: 2020-2021 Client: TOTAL E&P UGANDA |
Project: Consultancy Services for Construction Supervision of Valley dams in Karamoja Region. Funded by Deutsche Gesellschaft Fur Internationale Zusammenarbeit (GIZ) GmbH.
Year: 2020-2021 Client: Deutsche Gesellschaft Fur Internationale Zusammenarbeit (GIZ) GmbH |
Project: Consultancy Services for “Refugee Response Fund – Support for South Sudanese Refugees and Host Communities. Funded by KFW.
Year: 2019-2022. Client: Office of the Prime Minister |
Project: Consultancy Services for Feasibility Study and Preliminary Design of Four (4) Large Urban Water Supply Systems in Eastern Uganda. Funded by Government of Uganda.
Year: 2019-2022 Client: Ministry of Water and Environment, Water and Sanitation Development – East |
Project: Consultancy Services for the Design and Construction Supervision of Buhuka Gravity Water Flow Scheme at Buhuka Hoima. Funded by CNOOC Uganda Limited.
Year: 2018-2019 Client: CNOOC-Uganda |
Project: Consultancy Services for Assignment 3: Feasibility Studies, Detailed Engineering Design and Construction Supervision of Water Supply Systems of Kikandwa- Kasambya and Butenga Kawoko. Funded by African Development Bank.
Year: 2017-2021 Client: Water and Sanitation Development Facility – Central, Directorate of Water Development, Ministry of Water & Environment |
Project: Consultancy Services for National Water and Sewerage Corporation (NWSC) Asset Revaluation. Funded by EU, ITF, KfW, EIB, AFD and GoU
Year: 2017-2019 Client: National Water and Sewerage Corporation (NWSC) |
Project: Consultancy Services for Engineering Services for the Conceptualisation, Investigation, Design and Construction Supervision in the Upgrading of Landfill Sites at Lilangeni and establishment of New Landfill Facility at Mathanjana Area (Mmamethlake). Funded by Dr JS Moroka Local Municipality.
Year: 2017-2018 Client: Dr JS Moroka Local Municipality, Siyabuswa, South Africa |
Project: Consultancy Services to Support of the Water and Sanitation Development Facilities in Mbale and Lira. Funded by KFW.
Year: 2013-2015 Client: Directorate of Water Development |
Project: Consulting Services for Feasibility Study, Detailed Design and Construction Supervision of Mbale Water Supply and Sanitation, including Small Towns of Butalejja, Busolwe, Budaka, Kadama, Tirinyi and Kibuku, Uganda. Funded by World Bank.
Year: 2014-2017 Client: National Water and Sewerage Corporation |
Project: Consultancy Services for the Pre-Feasibility Study and Detailed Design of Multiple Land Husbandry, Dam and Hillside Irrigation Sites for 3,000Ha in different parts of Rwanda. Funded by IFC
Year: 2013-2014 Client: Ministry of Agriculture and Animal Resources |
Project: Consultancy Services for the Feasibility Study, Detailed Engineering Design and Construction Supervision of the Wastewater Treatment System for Ggaba Landing / Trading Centre and the Rehabilitation of Kirinya – Jinja Wastewater Treatment Plant. Funded by World Bank funded.
Year: 2012-2018. Client: Ministry of Water and Environment. |
Project: Consultancy Services for the Feasibility Study, Engineering Design and Construction Supervision of the Rehabilitation and Water Production Capacity optimization of Ggaba Water Treatment Complex and Minor Transmission Improvement Works – Short-term „quick win and no regret” measures – Kampala Water – Lake Victoria WATSAN” Project. Funded by KFW.
Year: 2012 – 2017. Client: National Water and Sewerage Corporation (NWSC) |